Moulding atlasINJECTION MOULDING ENGINEERING
The library
AN OPEN VIEW INTO INJECTION MOULDING

Six phases make
one working cell.

Follow the same two-cup moulding from the detailed mould, onto its ejector pins, into the robot tooling and onto the conveyor. Scrub the hand-off to inspect each contact.

Start exploring
04 / CONNECT THE WHOLE PROCESS

The connected production cell.

CYCLE EXPLORER
FOLLOW ONE SHOT

From clamp closing to conveyor.

12 narrated chapters · about 5 minutes · pause and inspect any part

Press + Cartesian robot + material & thermal systemsPARAMETRIC TEACHING MODEL / PERSPECTIVE
XYZ / ASSEMBLY AXES
Drag to orbit · scroll to zoom
0%
0%

Scrub the cycle to inspect a precise position.

A teaching sequence, not an executable control program. Robot entry, ejector action and mould closing require verified machine interfaces and guards.SI units · source-linked · keyboard accessible
THE MOULDING CYCLE / NORMALISED TIME
The tool closes and clamping force builds. Robot and ejector must be clear before closing.
FOLLOW THE CONNECTIONS

Timing turns equipment into a process.

Step through a qualitative cycle. Time is normalised; real operations overlap and depend on the process and machine.

FROM UNDERSTANDING TO EXPLORATION

What happens when you change a variable?

Try the engineering labs. Estimate clamping force, explore cooling time, and connect cycle time to output—with the assumptions in view.

Enter the engineering labs

Find your way around.

Search components, equipment and learning pages.